APPLICATION FOR OPEN ACCESS
The Electricity Act, 2019
(Act No. 11 of 2019)
The Electricity (Open Access) Regulations, 2024
SECTION A (INSTITUTION DETAILS):
LONG-TERM
MEDIUM-TERM
SHORT-TERM
Applicant Name:
Physical address:
Telephone number(s):
Email address:
SECTION B (TECHNICAL DETAILS):
Capacity Applied For (MVA/MW)
Average Demand (MVA/MW)
Period of Use (Number of Months)
INJECTION POINT DETAILS
Name of Utility
Voltage Level (kV)
Capacity of Connection Required (MVA)
Short Circuit Level (MVA)
Name of Substation and Feeder
DRAWING POINT DETAILS
Name of Users
Voltage Level (kV)
Capacity of Connection Required (MVA)
Short Circuit Level (MVA)
Name of Substation and Feeder
Other Transmission System connections:
Does drawer have other points of Transmission connection:
SECTION C (ATTACHMENTS)
ZRA Tax Clearance Certificate
Declaration of Funds to Support Financial Viability
SECTION D (DECLARATION BY APPLICANT)
Declaration
I
hereby declare that all information provided herein is within my personal knowledge and that -
(a) I am duly authorised to make this declaration; (b) I am the designated person responsible for this application; (c) I have read and understood this form and all accompanying regulations related hereto; and (d) All information provided herein is to the best of my knowledge true and correct.